The Schedule MD module for NetPoint enables project planners and schedulers to develop and analyze schedules to achieve more reliable project outcomes. The innovative features of Schedule MD provide certainty—a key advantage for owners and project teams managing complex construction programs. Utilizing Schedule IQ™, an algorithm that scores schedule reliability based on compliance with PMA’s Core Traits of a Reliable Schedule protocol, combined with additional metrics according to the DCMA 14-Point Assessment, project planners can identify and repair the weakest parts of their schedules, resulting in more accurate overall scores. More reliable schedules mean more confident decisions for the teams that build them and the owners who depend on them.
The Schedule IQ score is the most comprehensive schedule reliability rating system on the market. It is based on 42 individual metrics derived from the industry-leading Core Traits of a Reliable Schedule protocol. Scores are reported from 0 to 100 and provided for the overall schedule as well as in four categories: comprehensive, credible, well-built, and controlled. As a result, accuracy can be assessed at both macro and micro levels.
The Schedule IQ score considers logic, constraints, float, the critical path, relationships, durations, progress, forensics, resources, WBS assignments, risk, weather, earned value, and calendars.
IQ scores adjust internally based on the progress and level of your schedule. For example, the logic index for a level 2 schedule should be lower than that for a level 3 schedule, and Schedule MD accounts for that.
The Metrics Manager includes a number of tools for reviewing schedule submittals, including checklists for verifying that the narrative document conforms to best practices and scores accordingly. It also provides the ability to record and document stakeholder approval, making schedule sign-offs more transparent.