NetPoint® and Primavera P6 are both tools used to plan and schedule projects. There are similarities and differences between the two platforms, but they can both have a place in providing premium project control techniques on construction projects. For example, a planner may choose to develop Level 0, 1, and 2 schedules in NetPoint, but they may feel P6 is the more appropriate choice for Level 3 and 4 schedules. In scenarios like this, there are frequently situations where an export from one tool to the other is a valuable time-saver. In this session we will discuss the most common reasons where an export between NetPoint and P6 make sense; steps required to export from NetPoint to P6 and vice versa; what to look for after the data is exported; and tips and tricks to optimize the results of the export. Finally, we will demonstrate a round-trip export between NetPoint and P6 and provide an overview of how exporting with P6 may look in the forthcoming Project Summit.
Presented by John Zann