Early design-phase planning for long-term construction projects can be challenging in light of the ongoing design work and the uncertainty of the schedule in the distant future. Weeraya Orwatthana illustrates the benefits of using NetPoint on a multi-year public construction project to enhance team collaboration and support decision-making in the design and construction packaging scenarios. NetPoint clarifies key scheduling concepts and develops multiple scenarios for first, second, and third-level schedules to facilitate scope and schedule discussions among project team members. We will present the planning/schedule development process and different schedule formats and layouts that support discussions and assist the team’s decision.
Presented by: Weeraya Orwatthana