ADOT Casa Grande Tucson Hwy I-10
Overview
The Arizona Department of Transportation (ADOT) has approved $571 million in projects to widen highways and improve interchanges across the state. ADOT, in collaboration with the Federal Highway Administration (FHWA), is actively engaged in enhancing safety and optimizing traffic flow along a stretch of I-10 in Tucson. Concurrently, Pima County is extending Sunset Road between I-10 and River Road. The construction includes four miles of road widening from three lanes to four lanes on each side of I-10, as well as on and off ramp improvements. Other aspects of this program involve a lane addition near Ina Road, the reconstruction of Orange Grove Road, and the construction of new bridges over the Cañada del Oro Wash, Rillito River, and existing train tracks. ADOT is also making a path to connect Sunset Road to the Chuck Huckelberry Loop and is enhancing water drains and lighting improvements.
PMA Role
The PMA team is providing comprehensive schedule review services for both preliminary and baseline schedules, including providing regular monthly updates on the project’s progress schedule. Key services on this project include evaluating and reporting on the preliminary schedule, providing an assessment and detailed reporting on baseline schedule submissions, and reviewing and comprehensive reporting on monthly schedule updates.